• Mo-Fr: 9 am — 6 pm
  • Commissioning works

    Gas equipment commissioning is aimed to provide correct and safe system operation taking into account RF regulatory requirements.
    Commissioning works include:

    • checking correctness of all boiler equipment installation
    • checking hydraulic circuit system for leaks
    • checking electrical equipment earthing
    • boiler and pump equipment putting into operation
    • combustion process adjustment
    • all modes boiler operation checking and adjustment
    • taking all parameters required for work using special devices with statement drafting

    According to start-up results, detailed instructions for responsible personnel are given.

    After commissioning, equipment is put into operation and put to guarantee.